I-love-NDIS

Reliable Builders Cleaning Services in Sydney

- Building Site Construction Cleanup

Handover-ready builders clean for Sydney renovations and new builds, with staged scope, safe residue removal, and fast booking.

  • Fully insured team

  • Staged scope, rough to final (rough → final → touch-up)

  • Fast turnaround for handovers
  • Checklist sign-off

  • Finish-safe methods (glass, stone, timber)

  • Sydney-wide coverage

Partnering with top builders to transform visions into spotless realities!

Professional Licensed Builders Cleaners Sydney

Westlink Cleaning Services provides builders cleaning and post-construction cleaning across Sydney for new builds, renovations, and commercial fit-outs. With over a decade of Sydney projects, we know what handover-ready means in real conditions, including tight timelines, strata access rules, and local compliance expectations.

We remove fine dust, debris, packaging, and construction residue so the property is ready for handover, occupancy, photography, or open homes.

Every job starts with an on-site assessment and a detailed quote that matches the stage of the project, access conditions, and the finishes on site.

Our team follows safe work practices aligned with SafeWork NSW requirements and site inductions, and we work with care around high-risk details like glass, tracks, skirting, vents, tiles, and floors.

Need an end-of-build clean, after builders cleaning, or a touch-up after defects? We schedule around trades and deliver clear scope and quality checks to reduce delays and call-backs.

Fully insured (public liability up to $20M) and ISO certified, with documents available on request.

What Our Customers Think

Hear what our happy customers in Sydney have to say about Westlink Services

Chris Morris
Chris Morris
Contruction Cleaning
Amazing after construction job done by Westlink. I had tried a cleaning company on same property before them and the result was very bad and then I contact Westlink services and they knew the difference between general cleaning and construction cleaning. Highly recommend to anyone Thank you Zahid!!!
Itzquitz
Itzquitz
Construction Cleaning
Amazing after construction cleaning done by Team Zahid, they really detailed cleaned both rooms that were built. Definitely recommending them to my friends and family !!! also they are always on time. Well done, happy with the results !!
Sandesh Bhatta
Sandesh Bhatta
Construction Cleaning
Happy with cleaners of Westlink Cleaning services and specially Zaheed. Had done after construction cleaning & cleaners were professional with eye for every little detail. Happy to use and recommend their service.

Why a builders clean is different from normal cleaning

A builders clean is not a standard tidy-up. Construction sites leave behind fine dust, sharp debris, and residue that behave differently to everyday dirt. If the clean is done in the wrong order, with the wrong tools, or before trades are truly finished, the result is usually the same: dust returns, marks stay visible, and the handover gets delayed.

Common problems we see after a “normal clean” on a build include:

  • Fine plaster dust keeps coming back because it sits in vents, tracks, ledges, and high surfaces, then drops after the room looks finished.

  • Paint splatter and grout haze stay on new finishes and can harden if they are not treated early with the right method.

  • Sticky adhesive and silicone smears are left around glass, frames, joinery, and wet areas, making a new build look unfinished.

  • Scratch risk on glazing, stone, and timber goes up when grit is wiped or dragged instead of controlled and removed safely.

  • Handover deadlines get tighter when defects are rectified late and a re-clean is needed to keep the site presentation-ready.

  • Safety hazards remain like offcuts, nails, packaging, and debris that create tripping risks during final inspections.

  • Responsibility gets blurred when trades leave “builder’s mess” behind but the final clean is expected to solve everything without a clear scope.

The solution is not a harder wipe. It is the right order, staged scope, and surface-safe methods.

Builders cleaning, post-construction cleaning, and construction clean in Sydney

In Sydney search results, builders cleaning, post-construction cleaning, and construction clean all point to the same service outcome: a site that is handover-ready and ready for occupancy. The wording changes, but the expectation does not. You need fine dust, debris, and residue removed with finish-safe methods, so the property presents well and passes final checks.

Builders cleaning, post-construction cleaning, and construction clean in Sydney

What it is

  • A specialist construction-phase clean delivered at the right stage of the build. It covers handover cleaning, pre-handover cleanups, and construction project cleaning, including detailed dust control, debris removal, and residue removal across floors, glass, wet areas, joinery, tracks, and high-touch surfaces.
  • It can also include post-defect tidying when trades return to rectify items before sign-off.

What it is not

  • It is not defect fixing or trade work. We identify issues and can document problem areas, but repairs remain the builder or trades’ responsibility.

  • It is not unlimited waste hauling. We remove loose debris and small site waste as part of cleanup, but heavy rubble removal, skip bin supply, and regulated waste handling sit outside standard cleaning scope unless quoted as an add-on.

Expert Team
0 +
Happy Customers
0 +
Award Winning
0 +

Builders cleaning services Sydney for your project type

Every build is different, so the scope has to match the project stage, access conditions, and the finish standard you are handing over.

For builders, developers, and project managers

You care about reliability under changing schedules. We work around trades, manage site access, and deliver inspection-ready presentation with clear sign-off expectations. If defects are rectified after the first clean, we can return for a focused re-clean so you reduce call-backs and protect the handover date.

For homeowners and renovation projects

You care about a safe, comfortable home after construction. We remove fine dust and builder’s mess with finish-safe methods that protect new surfaces and improve air quality, so the space is move-in ready without the stress of trial-and-error cleaning.

For property managers and real estate

You care about presentation. We deliver sparkle and final detail cleaning for photography, inspections, and open homes, with tight turnaround and a consistent finish that lifts perceived value.

Our staged builders cleaning process

We deliver construction cleaning in stages so the site stays clean as the project moves toward handover. Each stage is scoped to reduce rework and keep finishes protected.

1. Rough / Initial Construction Clean

Bulk debris and rubbish removal, offcuts removal, and waste cleanup to make the site workable. Includes the first dust pass and hazard removal to reduce tripping risks and surface scratching from grit.

2. Final Builders Clean (handover-ready)

Detailed dust control and surface cleaning across kitchens, bathrooms, floors, and joinery. Tracks, frames, fittings, fixtures, and high surfaces are detailed so the property presents clean under natural and artificial light.

3. Sparkle / Presentation Clean

Showroom-quality final touches for handover, photography, and open homes. Glass polishing, final wipe-downs, and presentation-focused detailing to lift the finish.

4. Touch-up / Post-defect Re-clean

A fast reset after defects are rectified. Spot cleaning, markings and measurements removal, and a targeted detail pass to restore handover-ready presentation.

5. Progressive / Ongoing Site Cleans (optional)

Construction site maintenance and regular site cleans during the build, including amenities cleaning and ongoing dust and debris control.

Builders cleaning checklist for Sydney projects

A builders clean only works when the scope is clear and repeatable. This checklist is the standard we use on Sydney projects to deliver a handover-ready, occupancy-ready finish. It is designed to reduce call-backs, protect premium surfaces, and remove the fine dust and residue that makes new spaces look unfinished.

Master checklist 

  • Dust removal and dust control: high to low detail, ledges, corners, joinery faces, skirtings, architraves, and high-touch points

  • Debris and rubbish removal: offcuts, packaging, loose site waste, tripping hazards cleared from rooms and walk paths

  • Residue cleanup: paint marks, grout haze and cement film, silicone smears, adhesive residue and protective films

  • Floor and surface cleaning: project-safe cleaning by floor type with grit control to reduce scratch risk

  • Window and glass cleaning: interior glass, frames, sills, tracks, and detail finishing

  • Fixtures and fittings: switches, handles, taps, mirrors, shelves, and fittings wiped and presentation-finished

  • Bathrooms and kitchens: detailed surface cleaning, wet area finishing, and final touch presentation

Builders cleaning checklist for Sydney projects
Room-by-room checklist (detail scope)

Room-by-room checklist (detail scope)

  • Kitchens
    Cabinetry faces, splashbacks, appliances externals, benchtops, sink areas, and fine dust removal from edges and joins.
  • Bathrooms
    Grout haze checks, silicone residue removal, glass detailing, fittings and fixtures, mirrors, and wet area presentation finishing.
  • Floors
    Timber, tile, vinyl, and carpet areas cleaned to the right method, with spot cleaning and stain removal where applicable.
  • Windows and tracks
    Internal window and sill cleaning, tracks and frames detailed, markings and measurements removed where safe.
  • Walls, skirts, and doors
    Surface dusting, detail wipes around trims, skirtings, architraves, handles, and switches.
  • Vents, fans, and filters
    Airborne dust management focus points to reduce fine particle return and improve the feel of the space.

Construction residue removal, safely

Construction residue is where most “normal cleans” fail. These marks are not just cosmetic. If the wrong technique is used, glass scratches, stone etches, and timber dulls. We remove residue with controlled methods, correct sequence, and finish-safe products.

1. Grout haze and cement film

What it is: a dull film on tiles after grouting
Why DIY fails: abrasive scrubbing can scratch and spread haze
What we do differently: test areas, controlled removal, rinse and neutralise where required
Surface risk: tile face damage, grout edge wear

2. Paint splatter on glass

What it is: overspray and flecks on glazing and frames
Why DIY fails: dry scraping and grit wiping causes permanent scratches
What we do differently: soften, lift safely, and detail glass and edges in sequence
Surface risk: micro-scratches, damaged coatings

3. Silicone smears

What it is: smudges around wet areas, frames, and joinery
Why DIY fails: smears spread when wiped without proper lift technique
What we do differently: targeted lift and finishing, then final presentation wipe
Surface risk: dull patches, visible streaks in light

4. Adhesive residue and protective films

What it is: sticky marks from tape, labels, and surface protection
Why DIY fails: harsh solvents can stain, soften, or haze surfaces
What we do differently: controlled removal with safe products and spot testing
Surface risk: etching on stone, haze on glass, discoloration on joinery

5. Plaster sanding dust and dust in vents

What it is: fine particles that resettle after cleaning
Why DIY fails: wrong vacuuming spreads dust and it returns quickly
What we do differently: high to low order, fine dust control, attention to vents and edges
Surface risk: grit scratching, ongoing dust return

6. Concrete splatter cleaning

What it is: hardened splashes on floors and exterior edges
Why DIY fails: chipping or aggressive tools damage the substrate
What we do differently: safe softening and controlled removal methods
Surface risk: surface scarring, patchy appearance

7. Nylon packaging removal

What it is: leftover wraps, fragments, and adhesive remnants
Why DIY fails: tears leave residue and edges look unfinished
What we do differently: full removal with edge detailing and residue cleanup
Surface risk: sticky marks left behind, unfinished presentation

Builders Cleaning Service premium finishes without damage

Sydney builds often include premium materials that look perfect until the wrong cleaning method leaves scratches, haze, or etching. Our builders cleaning process is designed to protect finishes while delivering a flawless, handover-ready presentation.

Glazing and glass (tracks, frames, balustrades)

  • Do: remove grit first, clean edges and tracks, finish with streak control

  • Don’t: dry scrape or wipe grit across glass

Stainless steel and high-end fixtures

  • Do: finish with correct direction and detail around joins and fittings

  • Don’t: use abrasive cloths that leave swirl marks

Timber floors and trims

  • Do: grit control first, correct pads and low-moisture approach where needed

  • Don’t: drag debris across timber or over-wet delicate edges

Stone and engineered stone

  • Do: use surface-safe products, control dwell time, and prevent etching risk

  • Don’t: use harsh acids or unknown chemicals on premium benchtops

We use commercial-grade equipment, proven techniques, and optional low-odour, eco-friendly products where suitable for occupied spaces and sensitive environments. Builders and site managers also need compliance readiness and documentation.

Site-ready cleaning for Sydney builds

Builders cleaning is only “handover-ready” when it is also site-ready. On Sydney projects, that means the crew, method, and documentation must match construction site expectations, not domestic cleaning standards. Westlink operates with safety-first systems, clear scope, and the right compliance signals so builders, PMs, and site supervisors can approve work with confidence.

1. White Card: when it is required

On many construction sites, a White Card is required for anyone working on-site, especially where inductions apply, access is controlled, or trades are still active. If your site requires it, we allocate appropriately inducted staff and follow your site entry process so the clean does not become a compliance issue during final stages.

2. Construction Work Safety Method Statement alignment

We align with site rules and SafeWork NSW expectations by working to a planned method, controlling hazards, and following the correct order of work. Where required, we can support site induction requirements and provide documentation that helps builders manage risk and duty of care.

3. PPE and safety check approach

Before we start, we assess access, hazards, and high-risk areas. Our team uses PPE suitable for construction environments and applies safety checks for walk paths, sharp offcuts, glass areas, and wet zones to reduce incidents and keep the site inspection-ready.

4. Insurance (builder-ready confidence)

We carry public liability cover and operate as an accountable provider, not a casual crew. Insurance documentation can be supplied as part of quoting and site setup.

5. Hazardous materials boundaries: clear limits, clear escalation

Post-construction cleaning is not hazardous material remediation. We do not handle asbestos, confirmed lead-based residues, or regulated hazardous waste. If suspected materials are present, we stop, isolate the area where possible, and escalate to the builder or a licensed specialist so the site remains compliant and safe.

Quality assurance for handover-ready results

A builders clean is judged at the edges, in the light, and during the final walk-through. Our QA approach is designed to reduce call-backs, protect finishes, and support sign-off with clear expectations.

Supervisor inspection and handover checklist

Each project follows a structured checklist tied to the stage of cleaning (rough, final, sparkle, or touch-up). A supervisor-level review focuses on high-visibility zones and high-risk detail points such as tracks, fittings, wet areas, glass, skirtings, and joinery faces.

Before and after photo documentation (optional)

For builders and PMs who want proof-of-work, we can provide before and after photos for key areas and residue removal outcomes. This helps verify completion and reduces back-and-forth when schedules are tight.

Site supervisor sign-off workflow

Where required, we coordinate with the site supervisor for access, priority areas, and a final check. The goal is a clear “ready for handover” outcome, not an open-ended clean with shifting expectations.

Post-defect tidying and re-clean policy

If trades return for defect rectification, we can schedule a targeted touch-up or re-clean so presentation stays consistent and the handover date is protected.

Boundaries and expectations (reduces disputes)

  • What must be completed before cleaning: major trade work finished, paint and silicone curing where relevant, bulk waste removed or allocated, and a punch list confirmed if the project is in final stage.

  • Cleaning vs repair: we clean, detail, and remove residue where safe. We do not repair defects, repaint, re-silicone, or alter building work. If we identify issues that impact finish, we flag them for the builder.

Pricing becomes clearer once you understand scope, residues, access, and timeline.

Affordable Builders Cleaning Sydney | Builders clean cost in Sydney

Pricing for builders cleaning in Sydney varies because build types, residue load, access, and finish standards vary. The fastest way to avoid quote blowouts is a site-specific scope backed by a clear checklist, not a guess based on bedrooms alone.

Pricing models we use

  • Hourly rate: best for small touch-ups, post-defect tidying, and unpredictable scope

  • Per-sqm: useful for baseline comparison when scope and stage are consistent

  • Fixed quote: preferred for handover work where builders need budget certainty

What drives the quote

  • Size (sqm) and layout complexity
  • Project type: renovation vs new build vs commercial fit-out
  • Dust level and residue types: plaster dust, grout haze, silicone, adhesive, paint marks
  • Window count and glazing detail: tracks, frames, internal glass, balustrades
  • Access and site conditions: stairs, lift access, parking, working hours, site readiness
  • Timeline pressure: short notice, staged revisits, after-hours requirements
  • Add-ons: pressure washing, high-access cleaning, external areas where applicable
Construction residue removal, safely

Example scenarios (typical scope patterns)

  • Apartment renovation: fine dust control, kitchen and bathroom detailing, internal glass and tracks, residue spot removal

  • New build handover: staged final clean with full room-by-room checklist, floors, wet areas, joinery, glass detailing

  • Commercial fit-out: presentation clean for client handover, high-traffic areas, glass, floors, amenities, and entry zones

What you get with Westlink: free onsite quote, a detailed scope, accurate pricing, and no hidden fees because inclusions and exclusions are agreed before we start.

When to book a builders clean

Correct timing is the difference between a clean that holds and a clean that gets dusty again. We help you book the right stage so the site stays handover-ready, even with shifting programs.

Trade sequence guidance (the practical rule)

  • Book rough/initial cleaning when bulk works are done and you need the site safe and workable.

  • Book the final builders clean once high-dust trades are finished and the property is in handover preparation.

  • Book a sparkle/presentation clean right before handover, photography, or open homes.

  • Book a touch-up/re-clean after defect rectification so the finish resets without redoing everything.

Secure access and site coordination

We can work with lockbox access, keys, or site supervisor entry protocols. Our focus is smooth coordination, minimal disruption, and clear sign-off.

Our scheduling workflow

Site visit → scope confirmation → schedule → clean → report/QA → sign-off

We cover Sydney-wide. Here are the areas and local constraints we plan for.

Short notice and urgent handover support

If you have a tight deadline, we can prioritise an on-site assessment and confirm what can realistically be achieved within the available window. Timing and site readiness matter, so we align scope to deadline to protect the handover outcome.

Builders cleaning across Sydney

Westlink provides builders cleaning and post-construction cleaning across Sydney, with coverage designed around where construction activity is highest and where access conditions often affect timing and scope.

Region hubs we service

Suburb coverage

We regularly service areas such as Parramatta, Blacktown, Penrith, Liverpool, Chatswood, North Sydney, Bondi, and surrounding suburbs. If your site is outside these, we can still confirm availability based on access and scheduling.

Local constraints we plan for

Sydney sites often have conditions that change how a builder’s clean is delivered. We factor these into scope and quoting upfront:

Parking and loading access for equipment and waste removal

Lift access and booking windows in apartment builds and commercial towers

Strata rules for noise, common areas, after-hours movement, and rubbish handling

Access windows around trades, security, key/lockbox protocols, and site supervisor sign-off

Here is proof of results from real projects.

Recent builders cleaning results

Builders choose providers based on outcomes, not promises. Below are examples of what a staged builders clean looks like when it is done to a handover-ready standard.

Before and after gallery

A visual set showing typical post-construction conditions, including dust control, residue removal, glass clarity, wet-area finishing, and final presentation results.

Case snapshots (what changed, and why it mattered)

1) Apartment renovation: fine dust and adhesive residue

  • Problem: plaster sanding dust returning, sticky marks from protective film, visible haze on finishes

  • What we did: final builders clean with dust control order, residue cleanup on joinery and glass, detail pass on tracks and edges

  • Outcome: move-in ready finish with reduced dust return and clean presentation under light

2) New build handover: grout haze and wet area detailing

  • Problem: grout haze/cement film on tiles, silicone smears around wet areas, dull presentation during inspection walk-through

  • What we did: staged final clean with grout haze treatment, wet-area detailing, fittings and fixtures finishing, QA checklist inspection

  • Outcome: handover-ready bathrooms and kitchens with a consistent finish and reduced re-clean risk

Post-Construction Floor Prep Before and After (Handover Ready Look)
Post-Construction Space Reset Before and After (Tracked Soil Reduced)

3) Fit-out handover: glass, floors, and client-facing presentation

  • Problem: visible paint marks and construction residue on glass, scuffed presentation zones, dust in corners and high-touch areas

  • What we did: sparkle/presentation clean with glass polishing, floor and surface reset, detail cleaning of high-touch points and entry zones

  • Outcome: client-ready handover standard suitable for photos, inspections, and occupancy

4) Post-defect return: fast reset before sign-off

  • Problem: trades returned to rectify defects, new dust and markings appeared, handover date unchanged

  • What we did: touch-up and post-defect tidy, spot cleaning, markings removal, targeted detail pass in high-visibility areas

  • Outcome: clean reset for sign-off without repeating the entire scope

What Our Sydney Clients Say

Hear what our happy customers in Sydney have to say about Westlink

Builders clean vs deep clean vs end-of-lease

These services can look similar on the surface, but they solve different problems and are priced and scoped differently.

  • Builders clean (post-construction cleaning): targets builder’s mess, fine dust, debris, and construction residue so the property is handover-ready and ready for occupancy. It includes staged scope and finish-safe residue removal.

  • Deep clean: focuses on built-up grime in an occupied property. It is not designed for grout haze, paint marks, or construction dust behaviour across vents, tracks, and new finishes.

  • End-of-lease cleaning: focuses on tenancy standards and agent checklists. It is not a substitute for construction cleaning after renovations or new builds.

If your project is a new build, renovation, or fit-out, you usually need a builders clean first. End-of-lease or deep cleaning can be added only if the property needs tenancy-level extras beyond construction residue removal.

What contractors clean vs what we clean

A clean handover depends on clear responsibility boundaries. Trades typically remove their own bulk waste and tools, but a “trade tidy” is not the same as a specialist final clean.

What contractors usually handle

  • Removing tools and major leftover materials
  • Basic tidy of their work area
  • Bulk waste into site bins where provided

What Westlink specialists builders clean handles

  • Fine dust control across the entire property, including edges and high surfaces
  • Debris and tripping hazard removal that impacts inspection readiness
  • Residue cleanup, like paint marks, grout haze, silicone smears, and adhesive residue
  • Detailed finishing of glass, tracks, joinery faces, wet areas, and floors
  • Presentation-ready results for handover, photography, and occupancy

Note on “bond-back guarantee”

A bond-back guarantee applies to rental end-of-lease cleaning, not construction projects. For builders cleaning, the correct “guarantee” is a clear staged scope, QA checklist, and a defined touch-up or re-clean plan after defects are rectified.

The Challenges & Solutions Section

Local Post-Construction Problems? Westlink Has the Solutions

Enjoy a clean space today! Call Westlink for builders cleaning in your area by professional builders cleaners.

Let Westlink clean your property now. Don’t wait, get your free quote for builders cleaning in Sydney today!

Why Sydney builders choose Westlink for builders cleaning

A builders clean is judged on handover day, under light, at the edges, and against deadlines. Westlink is built for that standard, combining staged scope, finish-safe residue removal, and site-ready compliance so you get a clean that holds and a handover that stays on track.

13+ years on Sydney builds

We have delivered builders cleaning and post-construction cleaning across Sydney for over 13 years, so we know the access realities, scheduling pressure, and finish expectations that drive call-backs.

Site-ready compliance and local rules

We work in line with SafeWork NSW expectations and site induction requirements, and we respect Sydney environmental controls where relevant, including Sydney Water and local council considerations for waste and runoff.

Staged scope that prevents re-dusting

Rough, final, sparkle, and post-defect touch-ups are scoped as separate outcomes, so you do not pay twice for the same work and the site does not get re-dusted after the “final clean.”

Finish-safe residue removal

We remove grout haze, paint marks, silicone smears, and adhesive residue using surface-safe methods to reduce scratch risk on glazing, stone, timber, and premium fixtures.

QA sign-off built for handover

We use a checklist-led inspection process and can support site supervisor sign-off, plus before/after photo documentation on request. This reduces disputes and makes completion easy to verify.

$20M insurance and ISO systems

Builders want certainty. We operate with up to $20M public liability cover and ISO-certified systems, so your project has professional accountability, not “best effort” cleaning.

Clear scopes, fair pricing, no hidden extras

Every project starts with an on-site assessment, a detailed checklist, and a written quote tied to stage, access, and residue load. You see inclusions and options up front, so there are no surprise add-ons later.

Proven Sydney experience

With more than a decade of local project experience, we understand Sydney site conditions, strata rules, access windows, and inspection standards. That means more accurate scopes, fewer surprises, and a smoother handover

Construction cleaning specialists

We focus on builders cleaning, post-construction cleaning, and end-of-build cleans for Sydney projects. Our crews are trained for construction environments, staged cleans, and residue removal, so you get a finish that holds up at walk-through.

Simple 3 Steps Clean

01.
Request a Quote

Send your details or call us with the site location, project type, and your target handover date. If you have plans or photos, share them for a faster, more accurate scope.

02.
Assessment & Scheduling

Send your details or call us with the site location, project type, and your target handover date. If you have plans or photos, share them for a faster, more accurate scope.

03.
Expert Cleaning

Our team completes the clean using finish-safe methods and construction-ready processes. A quality check follows to confirm the site is handover-ready, and we can support sign-off expectations with a checklist and optional photo documentation.

Get a free onsite quote for builders cleaning in Sydney

If you need a builders clean, post-construction clean, or end-of-build clean that holds up at inspection, Westlink is ready to scope it properly and deliver it on schedule.

Request a free onsite quote and we will confirm inclusions, timeline, and any add-ons based on your site conditions.

Frequently Asked Questions About Our Services

What is included in a builders clean?

A builders clean covers dust control, debris and rubbish removal, residue cleanup (paint marks, grout haze, silicone, adhesive), floor and surface cleaning, bathrooms and kitchens detailing, and window and glass cleaning including tracks and frames. The exact inclusions depend on whether you book a rough clean, final builders clean, sparkle clean, or post-defect touch-up.

How long does a post-construction clean take?

Time depends on site size, dust load, residue types, window count, and access. A small renovation touch-up can be quick, while a full handover clean for a new build or commercial fit-out can take a full day or longer. We confirm timeframe after the onsite assessment and scope.

How is builders cleaning cost calculated in Sydney?

Quotes are based on sqm and layout complexity, project type (reno, new build, fit-out), dust and residue level, glazing detail, access constraints (stairs, lifts, parking), timeline pressure, and any add-ons like pressure washing or high access cleaning. You receive a detailed scope with no hidden fees.

Can you remove grout haze and paint from glass safely?

Yes, when it is handled with the right method and sequence. Grout haze and paint marks require finish-safe techniques to avoid scratching glass, damaging tile faces, or leaving dull patches. We assess the surface first, then use controlled residue removal and a final finish pass.

Do you need a White Card and SWMS alignment for construction sites?

Many Sydney sites require White Card for anyone working on-site and expect cleaning to align with site induction rules and SafeWork NSW expectations. If your site requires it, we allocate appropriately inducted staff and follow your access process. Documentation can be provided where required.

Will dust keep coming back after the clean? What about vents?

Fine plaster dust can resettle if it is still trapped in vents, tracks, ledges, and high surfaces, or if trades return after cleaning. That is why we clean high to low and include detail points like vents and tracks. If dust returns due to post-clean trade activity, a touch-up re-clean is the fastest fix.

How soon can you book builders cleaning in Sydney?

Availability depends on location, project stage, and scope. If you have a handover deadline, contact us early. We can prioritise onsite assessment and align the right clean stage to your timeline.

What needs to be ready before you arrive?

For best results, major trades should be completed for the stage you are booking, bulk waste should be cleared or allocated, and access should be confirmed (keys, lockbox, site supervisor entry). If you are booking a final builders clean, it helps to confirm paint and silicone curing and provide any punch list or defect items that may affect the scope.

Request a free onsite quote and we will confirm inclusions, timeline, and any add-ons based on your site conditions.